Abstract

This study aims to minimize defects and increase production time efficiency in the manufacture of transformer tanks to support the sustainability and competitiveness of the metal industry. Problems faced include process waste, late delivery, and production results that do not reach the target, which impacts quality and customer satisfaction. The method used is descriptive qualitative through field observations with analysis of Current State Value Stream Mapping, Fishbone Diagram, Value Stream Analysis Tools, and Future State Value Stream Mapping. The study focused on the welding, assembly, NDT test, finishing, and quality control processes for the 2023–2024 period which have high levels of waste and product defects, to formulate proposals for improving the production process.

References

Abbadi, L. El, Elrhanimi, S., & Manti, S. El. (2020). A literature review on the evolution of lean manufacturing. Journal of System and Management Sciences, 10(4), 13–30. https://doi.org/10.33168/JSMS.2020.0402

Adityah Maulana, & Achmad Misbah. (2024). Identifikasi Pemborosan dalam Proses Produksi Pakan Ternak Ayam di PT.XYZ dengan Menggunakan Metode Value Stream Analysis Tools (VALSAT). Reslaj: Religion Education Social Laa Roiba Journal, 6(11), 5437–5453. https://doi.org/10.47467/reslaj.v6i11.4081

AlifDian. R, M., Nofirza, N., Silvia, S., Yola, M., & Devani, V. (2023). A Analisis Lean Manufacturing Menggunakan Metode VSM dan WRM pada Lini Produksi Riau Jaya Paving. Jurnal Surya Teknika, 10(1), 574–583. https://doi.org/10.37859/jst.v10i1.4290

Api, P., Pada, G. B., & Konstruksi, P. (2013). ANALISIS FAKTOR-FAKTOR PENYEBAB CACAT PENGELASAN PIPA API 5L Gr.B PADA PROYEK KONSTRUKSI PIPA. Jurnal TeknikIndustri, 4(2), 109–122. https://doi.org/10.35968/jtin.v4i2.819

Arunizal, S., Wardhani, D. H., & Windarta, J. (2024). Penerapan Value Stream Mapping (VSM) untuk Menurunkan Lead Time Process dan Meningkatkan Kinerja Aktivitas Pengadaan di Site Tambang. Jpii, 2(3), 141–150. https://doi.org/10.14710/jpii.2024.23282

Azeez, K. A., & Mahdi, I. (2023). Value Stream Mapping within Green accounting: Opportunities and challenges. Resmilitaris, 13(November). https://resmilitaris.net/menu-script/index.php/resmilitaris/article/view/1537

Bagas Wahyu Dwi Nugroho, & Faritsy, A. Z. Al. (2024). Meminimasi Waste Proses Produksi Dengan Pendekatan Lean Manufacturing. Jurnal Aplikasi Ilmu Teknik Industri (JAPTI), 5(1), 40–52. https://doi.org/10.32585/japti.v5i1.5208

Baharudin, I., Purwanto, A. J., & Fauzi, M. (2021). Analisis Pemborosan Menggunakan “9 Waste" Pada Proses Produksi Pt Abc. Jurnal Ilmiah Teknologi Infomasi Terapan, 8(1), 187–192. https://doi.org/10.33197/jitter.vol8.iss1.2021.745

Bakhori, A. (2021). Analisa Cacat Hasil Pengelasan Pada Baja Krbon Rendah Terhadap Pengaruh Masukan Panas Las. Semnastek Uisu, 0–5.

Baldah, N., Amaruddin, H., & Sutaryo. (2021). Universitas Pelita Bangsa. JurnalManjemen, 7(9), 136–144. http://www.maker.ac.id/index.php/maker

Čiarnienė, R., & Vienažindienė, M. (2015). An Empirical Study of Lean Concept Manifestation. Procedia - Social and Behavioral Sciences, 207, 225–233. https://doi.org/10.1016/j.sbspro.2015.10.091

Dione Livia Hondro. (2021). 3 1,2,3. 16(1), 86–94.

Eko Prasetyo Prayogi Sihombing, & Marwan Marwan. (2024). Analisa Pengendalian Kualitas Produk Dengan Metode Six Sigma dan Analisa Kaizen di CV. Bintang Terang Medan. Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri, 2(1), 14–31. https://doi.org/10.61132/manufaktur.v2i1.142

Fitri Pratama, P., & Yuliarty, P. (2024). Analisis Pengendalian Kualitas Pengelasan Pada Body Dump Truck Dengan Metode DMAIC. Proceeding Mercu Buana Conference on Industrial Engineering, 6(July), 292.

Fole, A., & Januar Kulsaputro. (2023). Implementasi Lean Manufacturing Untuk Mengurangi Waste Pada Proses Produksi Sirup Markisa. Journal of Industrial Engineering Innovation, 1(1), 23–29. https://doi.org/10.58227/jiei.v1i1.59

Horsthofer-Rauch, J., Guesken, S. R., Weich, J., Rauch, A., Bittner, M., Schulz, J., & Zaeh, M. F. (2024). Sustainability-integrated value stream mapping with process mining. Production and Manufacturing Research, 12(1), 1–27. https://doi.org/10.1080/21693277.2024.2334294

Julian, F., Kardiman, & Fauji, N. (2022). Sistem Pengendalian Kualitas (Quality Control) Pada Proses Fabrikasi Project “Refinery Development Master Plan (RDMP)’’’.” Jurnal Ilmiah Wahana Pendidikan, 8(15), 228–237. https://doi.org/10.5281/zenodo.7049124

Justan, R., Margiono, M., Aziz, A., & Sumiati, S. (2024). Penelitian Kombinasi (Mixed Methods). ULIL ALBAB : Jurnal Ilmiah Multidisiplin, 3(2), 253–263. https://doi.org/10.56799/jim.v3i2.2772

Kumar, N., Shahzeb Hasan, S., Srivastava, K., Akhtar, R., Kumar Yadav, R., & Choubey, V. K. (2022). Lean manufacturing techniques and its implementation: A review. Materials Today: Proceedings, 64(October), 1188–1192. https://doi.org/10.1016/j.matpr.2022.03.481

Langit, P. S., & Insanita, R. (2022). Penerapan Praktik Lean Service Melalui Value Stream Mapping padaDepartemen Food and Beverage Service Hotel X. Jurnal Manajemen Dan Usahawan Indonesia, 45(2), 94–110. https://doi.org/10.7454/jmui.v45i2.1032

Maesaroh, I., & Purnama, S. (2021). Journal of Islamic Management Editorial Office: Analisis Total Quality Management (TQM) Dalam Manajemen Operasional di Intanaya Tour and Travel Cabang Surabaya. Journal of Islamic Management, 1(1), 43–54.

Maware, C., Okwu, M. O., & Adetunji, O. (2022). A systematic literature review of lean manufacturing implementation in manufacturing-based sectors of the developing and developed countries. International Journal of Lean Six Sigma, 13(3), 521–556. https://doi.org/10.1108/IJLSS-12-2020-0223

Noviyana, N., Abdullah, M. H., Suwondo, A. J., & Riyanto, O. A. W. (2024). Penerapan Lean Manufacturing dengan Metode Value Stream Mapping (VSM) untuk Meningkatkan Produktifitas (Studi Kasus: PT. XYZ). Journal of System Engineering and Technological Innovation (JISTI), 3(01), 215–230. https://doi.org/10.38156/jisti.v3i01.74

Nusraningrum, D., & Senjaya, E. G. (2019). Over all Equipment Effectiveness (OEE) Measurement Analysis on Gas Power Plant with Analysis of Six Big Losses. Www.Ijbmm.Com International Journal of Business Marketing and Management, 4(11), 2456–4559. www.ijbmm.com

Purwanto, A., Wijoyo, W., & Fajar Riyadin, A. (2023). Pengaruh Polaritas Mesin Las pada Pengelasan SMAW (Shielded Metal Arc Welding) Terhadap Sifat Fisik dan Mekanik Baja Karbon Rendah. Jurnal Teknik Indonesia, 2(4), 150–158. https://doi.org/10.58860/jti.v2i4.238

Razzaq, D. (2024). Impact of lean manufacturing practices on the performance of manufacturing industries. South Asian Journal of Operations and Logistics, 3(2), 113–126. https://doi.org/10.57044/sajol.2024.3.2.2432

Sampat Deshmukh, A., Rangnath Dighe, P., & Jagannath Shelke, S. (2023). Total Quality Management (TQM): A Need of Industry for Quality Product. International Journal of Pharmacy and Chemistry, October. https://doi.org/10.11648/j.ijpc.20230902.12

Santoso, A. A., Pribadi, R. J., & Raharja, S. (2022). Deteksi Cacat Hasil Pengelasan Pada Baja Karbon Rendah Menggunakan Fungsi Transfer Untuk Non Destructive Test (Ndt). Jurnal UNIMUS, 5, 107–108. https://prosiding.unimus.ac.id/index.php/semnas/article/view/1085

Sarker, A., Ahmmed, R., Ahsan, S. M., Rana, J., Ghosh, M. K., & Nandi, R. (2023). A comprehensive review of food waste valorization for the sustainable management of global food waste. Sustainable Food Technology, 2(1), 48–69. https://doi.org/10.1039/d3fb00156c

Seraya, N., Litvinov, V., Daumova, G., Zhusipov, N., Idrisheva, Z., & Aubakirova, R. (2023). Production Waste Management: Qualitative and Quantitative Characteristics and the Calculation of the Hazard Class of Phosphogypsum. Processes, 11(10), 1–17. https://doi.org/10.3390/pr11103033

Shabrina Ayu Hananta, & Jeni Susyanti. (2024). Implementation of Total Quality Management (TQM) in Organizations and Business. International Journal of Economics and Management Research, 3(2), 322–332. https://doi.org/10.55606/ijemr.v3i2.227

Soori, M., Arezoo, B., & Dastres, R. (2022). Productivity enhancement by advanced lean production systems. July.

Sundar, R., Balaji, A. N., & Satheesh Kumar, R. M. (2014). A review on lean manufacturing implementation techniques. Procedia Engineering, 97, 1875–1885. https://doi.org/10.1016/j.proeng.2014.12.341

Syalendra, R. jaka, Nofirza, N., Hadiyul Umam, M. I., Melfa Yola, & Misra Hartati. (2024). Analisis Vsm ( Value Stream Mapping ) Pada Proses Pembuatan Produk Egrek Sawit Di Unit Pandai Besi Asadi. Jurnal Perangkat Lunak, 6(1), 156–165. https://doi.org/10.32520/jupel.v6i1.3089

Tanha, N. I., Sumi, S. S., Rahman, T., & Azad, A. (2025). Optimizing Manufacturing Efficiency through Six Sigma : A Comprehensive Approach in Industrial Engineering Optimizing Manufacturing Efficiency through Six Sigma : A Comprehensive Approach in Industrial Engineering. April. https://doi.org/10.36348/sjet.2025.v10i03.008

Topalović, S. (2015). The Implementation of Total Quality Management in Order to Improve Production Performance and Enhancing the Level of Customer Satisfaction. Procedia Technology, 19, 1016–1022. https://doi.org/10.1016/j.protcy.2015.02.145

Undap, M., Karamoy, H., & Tirayoh, V. Z. (2023). Evaluasi Penerapan Total Quality Manajemen (Tqm) Pada Pt. Pln (Persero) Up2B Sistem Minahasa. Jurnal EMBA : Jurnal Riset Ekonomi, Manajemen, Bisnis Dan Akuntansi, 11(3), 698–705. https://doi.org/10.35794/emba.v11i3.48851

Wiranto, M. I., Patras, L. S., & Silimang, S. (2021). Analisa Kinerja Transformator Distribusi Kawanua Emerald City-Amethyst. Teknik Elektro, 2(1), 1–11.

Published

2026-02-26